GENERAL ASSEMBLY OF NORTH CAROLINA

SESSION 2013

 

 

SESSION LAW 2013-408

HOUSE BILL 135

 

 

AN ACT to make adjustments to the fee schedule for permits for sanitary landfills and transfer stations to reflect extension of the duration of these permits as directed by s.l. 2012‑187, as recommended by the environmental review commission.

 

The General Assembly of North Carolina enacts:

 

SECTION 1.  G.S. 130A‑294 is amended by adding a new subsection to read:

"(a2)     Permits for sanitary landfills and transfer stations shall be issued for (i) a design and operation phase of five years or (ii) a design and operation phase of 10 years. A permit issued for a design and operation phase of 10 years shall be subject to a limited review within five years of the issuance date."

SECTION 2.  G.S. 130A‑295.8 reads as rewritten:

"§ 130A‑295.8.  Fees applicable to permits for solid waste management facilities.

(a)        The Solid Waste Management Account is established as a nonreverting account within the Department. All fees collected under this section shall be credited to the Account and shall be used to support the solid waste management program established pursuant to G.S. 130A‑294.

(b)        As used in this section:

(1)        "New permit" means any of the following:

a.         An application for a permit for a solid waste management facility that has not been previously permitted by the Department. The term includes one site suitability review, the initial permit to construct, and one permit to operate the constructed portion of a phase included in the permit to construct.

b.         An application that proposes to expand the boundary of a permitted waste management facility for the purpose of expanding the permitted activity.

c.         An application that includes a proposed expansion to the boundary of a waste disposal unit within a permitted solid waste management facility.

d.         An application for a substantial amendment to a solid waste permit, as defined in G.S. 130A‑294.

(2)        "Permit amendment" means any of the following:

a.         An application for a permit to construct and one permit to operate for the second and subsequent phases of landfill development described in the approved facility plan for a permitted solid waste management facility.

b.         An application for the five‑year renewal of a permit for a permitted solid waste management facility or for a permit review of a permitted solid waste management facility.

c.         Any application that proposes a change in ownership or corporate structure of a permitted solid waste management facility.

(3)        "Permit modification" means any of the following:

a.         An application for any change to the plans approved in a permit for a solid waste management facility that does not constitute a "permit amendment" or a "new permit".

b.         A second or subsequent permit to operate for a constructed portion of a phase included in the permit to construct.

c.         An application for a five‑year limited review of a 10‑year permit, as required by G.S. 130A‑294(a2), including review of the operations plan, closure plan, post‑closure plan, financial assurance cost estimates, environmental monitoring plans, and any other applicable plans for the facility.

(4)        "Major permit modification" means an application for any change to the approved engineering plans for a sanitary landfill or transfer station permitted for a 10‑year design capacity that does not constitute a "permit amendment," "new permit," or "permit modification."

(c)        An applicant for a permit shall pay an application fee upon submission of an application according to the following schedule:

(1)        Municipal Solid Waste Landfill accepting less than 100,000 tons/year of solid waste, New Permit – Permit (Five‑Year) – $25,000.

(1a)      Municipal Solid Waste Landfill accepting less than 100,000 tons/year of solid waste, New Permit (Ten‑Year) – $38,500.

(2)        Municipal Solid Waste Landfill accepting less than 100,000 tons/year of solid waste, Amendment – Amendment (Five‑Year) – $15,000.

(2a)      Municipal Solid Waste Landfill accepting less than 100,000 tons/year of solid waste, Amendment (Ten‑Year) – $28,500.

(3)        Municipal Solid Waste Landfill accepting less than 100,000 tons/year of solid waste, Modification – Modification (Five‑Year) – $1,500.

(3a)      Municipal Solid Waste Landfill accepting less than 100,000 tons/year of solid waste, Major Modification (Ten‑Year) – $7,500.

(4)        Municipal Solid Waste Landfill accepting 100,000 tons/year or more of solid waste, New Permit – Permit (Five‑Year) – $50,000.

(4a)      Municipal Solid Waste Landfill accepting 100,000 tons/year or more of solid waste, New Permit (Ten‑Year) – $77,000.

(5)        Municipal Solid Waste Landfill accepting 100,000 tons/year or more of solid waste, Amendment – Amendment (Five‑Year) – $30,000.

(5a)      Municipal Solid Waste Landfill accepting 100,000 tons/year or more of solid waste, Amendment (Ten‑Year) – $57,000.

(6)        Municipal Solid Waste Landfill accepting 100,000 tons/year or more of solid waste, Modification –Modification (Five‑Year) – $3,000.

(6a)      Municipal Solid Waste Landfill accepting 100,000 tons/year or more of solid waste, Major Modification (Ten‑Year) – $15,000.

(7)        Construction and Demolition Landfill accepting less than 100,000 tons/year of solid waste, New Permit – Permit (Five‑Year) – $15,000.

(7a)      Construction and Demolition Landfill accepting less than 100,000 tons/year of solid waste, New Permit (Ten‑Year) – $22,500.

(8)        Construction and Demolition Landfill accepting less than 100,000 tons/year of solid waste, Amendment –Amendment (Five‑Year) – $9,000.

(8a)      Construction and Demolition Landfill accepting less than 100,000 tons/year of solid waste, Amendment (Ten‑Year) – $16,500.

(9)        Construction and Demolition Landfill accepting less than 100,000 tons/year of solid waste, Modification –Modification (Five‑Year) – $1,500.

(9a)      Construction and Demolition Landfill accepting less than 100,000 tons/year of solid waste, Major Modification (Ten‑Year) – $4,500.

(10)      Construction and Demolition Landfill accepting 100,000 tons/year or more of solid waste, New Permit – Permit (Five‑Year) – $30,000.

(10a)    Construction and Demolition Landfill accepting 100,000 tons/year or more of solid waste, New Permit (Ten‑Year) – $46,000.

(11)      Construction and Demolition Landfill accepting 100,000 tons/year or more of solid waste, Amendment –Amendment (Five‑Year) – $18,500.

(11a)    Construction and Demolition Landfill accepting 100,000 tons/year or more of solid waste, Amendment (Ten‑Year) – $34,500.

(12)      Construction and Demolition Landfill accepting 100,000 tons/year or more of solid waste, Modification –Modification (Five‑Year) – $2,500.

(12a)    Construction and Demolition Landfill accepting 100,000 tons/year or more of solid waste, Major Modification (Ten‑Year) – $9,250.

(13)      Industrial Landfill accepting less than 100,000 tons/year of solid waste, New Permit –Permit (Five‑Year) – $15,000.

(13a)    Industrial Landfill accepting less than 100,000 tons/year of solid waste, New Permit (Ten‑Year) – $22,500.

(14)      Industrial Landfill accepting less than 100,000 tons/year of solid waste, Amendment –Amendment (Five‑Year) – $9,000.

(14a)    Industrial Landfill accepting less than 100,000 tons/year of solid waste, Amendment (Ten‑Year) – $16,500.

(15)      Industrial Landfill accepting less than 100,000 tons/year of solid waste, Modification –Modification (Five‑Year) – $1,500.

(15a)    Industrial Landfill accepting less than 100,000 tons/year of solid waste, Major Modification (Ten‑Year) – $4,500.

(16)      Industrial Landfill accepting 100,000 tons/year or more of solid waste, New Permit – Permit (Five‑Year) – $30,000.

(16a)    Industrial Landfill accepting 100,000 tons/year or more of solid waste, New Permit (Ten‑Year) – $46,000.

(17)      Industrial Landfill accepting 100,000 tons/year or more of solid waste, Amendment –Amendment (Five‑Year) – $18,500.

(17a)    Industrial Landfill accepting 100,000 tons/year or more of solid waste, Amendment (Ten‑Year) – $34,500.

(18)      Industrial Landfill accepting 100,000 tons/year or more of solid waste, Modification –Modification (Five‑Year) – $2,500.

(18a)    Industrial Landfill accepting 100,000 tons/year or more of solid waste, Major Modification (Ten‑Year) – $9,250.

(19)      Tire Monofill, New Permit – $1,750.

(19a)    Tire Monofill, New Permit (Ten‑Year) – $2,500.

(20)      Tire Monofill, Amendment – $1,250.

(20A)   Tire Monofill, Amendment (Ten‑Year) – $2,000.

 

(21)      Tire Monofill, Modification – $500.

(21A)   Tire Monofill, Major Modification – $625.

(22)      Treatment and Processing, New Permit – $1,750.

(23)      Treatment and Processing, Amendment – $1,250.

(24)      Treatment and Processing, Modification – $500.

(25)      Transfer Station, New Permit –Permit (Five‑Year) – $5,000.

(25a)    Transfer Station, New Permit (Ten‑Year) – $7,500.

(26)      Transfer Station, Amendment – Amendment (Five‑Year) – $3,000.

(26a)    Transfer Station, Amendment (Ten‑Year) – $5,500.

(27)      Transfer Station, Modification –Modification (Five‑Year) – $500.

(27a)    Transfer Station, Major Modification (Ten‑Year) – $1,500.

(28)      Incinerator, New Permit – $1,750.

(29)      Incinerator, Amendment – $1,250.

(30)      Incinerator, Modification – $500.

(31)      Large Compost Facility, New Permit – $1,750.

(32)      Large Compost Facility, Amendment – $1,250.

(33)      Large Compost Facility, Modification – $500.

(34)      Land Clearing and Inert, New Permit – $1,000.

(35)      Land Clearing and Inert, Amendment – $500.

(36)      Land Clearing and Inert, Modification – $250.

(d)        A permitted solid waste management facility shall pay an annual permit fee on or before 1 August of each year according to the following schedule:

(1)        Municipal Solid Waste Landfill – $3,500.

(2)        Post‑Closure Municipal Solid Waste Landfill – $1,000.

(3)        Construction and Demolition Landfill – $2,750.

(4)        Post‑Closure Construction and Demolition Landfill – $500.

(5)        Industrial Landfill – $2,750.

(6)        Post‑Closure Industrial Landfill – $500.

(7)        Transfer Station – $750.

(8)        Treatment and Processing Facility – $500.

(9)        Tire Monofill – $500.

(10)      Incinerator – $500.

(11)      Large Compost Facility – $500.

(12)      Land Clearing and Inert Debris Landfill – $500.

(e)        The Department shall determine whether an application for a permit for a solid waste management facility that is subject to a fee under this section is complete within 90 days after the Department receives the application for the permit. A determination of completeness means that the application includes all required components but does not mean that the required components provide all of the information that is required for the Department to make a decision on the application. If the Department determines that an application is not complete, the Department shall notify the applicant of the components needed to complete the application. An applicant may submit additional information to the Department to cure the deficiencies in the application. The Department shall make a final determination as to whether the application is complete within the later of: (i) 90 days after the Department receives the application for the permit less the number of days that the applicant uses to provide the additional information; or (ii) 30 days after the Department receives the additional information from the applicant. The Department shall issue a draft permit decision on an application for a permit within one year after the Department determines that the application is complete. The Department shall hold a public hearing and accept written comment on the draft permit decision for a period of not less than 30 or more than 60 days after the Department issues a draft permit decision. The Department shall issue a final permit decision on an application for a permit within 90 days after the comment period on the draft permit decision closes. The Department and the applicant may mutually agree to extend any time period under this subsection. If the Department fails to act within any time period set out in this subsection, the applicant may treat the failure to act as a denial of the permit and may challenge the denial as provided in Chapter 150B of the General Statutes."

SECTION 3.  This act is effective when it becomes law and applies to permit applications submitted on or after July 1, 2013.

In the General Assembly read three times and ratified this the 25th day of July, 2013.

 

 

                                                                    s/  Tom Apodaca

                                                                         Presiding Officer of the Senate

 

 

                                                                    s/  Thom Tillis

                                                                         Speaker of the House of Representatives

 

 

                                                                    s/  Pat McCrory

                                                                         Governor

 

 

Approved 10:51 a.m. this 23rd day of August, 2013